Hydro generation asset in Sierra LeoneIlustrativo
Comércio de Energia e Crescimento IndustrialAFCEN-SL-008

Betmai Hydroelectric Project

Sierra Leone · NorthernPower · Generation

A 27 MW run-of-river hydro scheme on the Pampana River in Northern Sierra Leone, delivering 142.9 GWh a year of modelled output under an agreed 25-year PPA into a grid that meets less than half of national demand.

Custo do projeto
c. USD 103m
All-in, incl. grid link and IDC¹
Capacidade
27 MW
142.9 GWh/yr/ano modelado
Capital pretendido
USD 40m
Equity sought
Instrumento
Fundos próprios
Base case 70% debt, 30% equity
Calendário
To financial close
Then construction

Justificação

Grid supply is about 140 MW against unconstrained demand of about 320 MW, rising to 485 MW by 2030, and only 36% of Sierra Leoneans have electricity.² Betmai adds renewable baseload from a natural 60 m waterfall, with no large storage dam.

Scheme
80 m gross head; 40 m³/s design flow
Units
4 Francis: 1 × 2.7 MW, 3 × 8.1 MW
Grid
28 km 66 kV line to Magburaka
Stage
Late-stage development, to financial close

Oportunidade de investimento

Estrutura da transação

Equity in a 27 MW run-of-river plant with an agreed 25-year PPA.

Utilização dos fundos

Weir and intake, power canal, three steel penstocks, powerhouse and the 28 km 66 kV line.

Base de receitas

Plant-gate sale at USD 125/MWh (USD 105 generation, USD 20 transmission), escalating 2% a year.

O pedido

Equity investors to join the raise that takes the project to financial close.

Porque é financiável

Unmet demand.

Grid supply of about 140 MW against 320 MW of demand, rising to 485 MW by 2030.²

Contracted revenue.

25-year PPA agreed with a utility offtaker, modelled as take-or-pay at USD 125/MWh.

Partners.

Government of Sierra Leone as PPA counterparty; supply to the national grid and West Africa Power Pool.¹

Anchor investors and supporters.

Open: equity positions available ahead of financial close.

Dados e evidências · Hydrology and yield

43 yr
Flow record, 1969–2011
1,750 km²
Catchment area
42 m³/s
Mean river flow
80 / 76 m
Gross / net head
142.9 GWh
Modelled annual yield

Maturidade e calendário do projeto

  1. OriginationLate-stage development
  2. FeasibilityStudy updated 2017
  3. StructuringCapital structure under review
  4. Financial closeCurrent stage
  5. ConstructionTo follow

Principais riscos e medidas de mitigação

Hydrology

43-year flow record correlated to an on-site gauge; run-of-river design avoids reservoir risk.

Offtaker payment

Take-or-pay PPA with a sovereign counterparty; credit support terms in the Tier 2 data room.

Cost and schedule

Estimates are at 2017 prices; the updated cost breakdown is released under NDA.

Condições da transação

Offtaker
Utility; sovereign counterparty
Contract status
PPA agreed; 25-year tenor
Tariff basis
USD 125/MWh at plant gate, +2% a year
E&S category
AfCEN screening; category to be confirmed
WAIIS pillar
Energy Trade & Industrial Growth

Impacto no desenvolvimento

Access

Only 36% of Sierra Leoneans have electricity; the national target is 78% by 2030.²

Climate

Supports lifting renewables from 46% to 52% of the energy mix by 2030.²

Regional integration

Planned supply to the national grid and the West Africa Power Pool.¹

  1. Indicative, from the feasibility study update (2017, 2017 prices); capital structure under review. Returns released under NDA.
  2. Government of Sierra Leone, National Energy Compact (Mission 300), 2025.
  3. As imagens são ilustrativas.

O registo cria uma conta de investidor. A AfCEN conclui a integração e o KYC antes de divulgar qualquer coisa além desta página — o PDF do teaser contém exatamente o que está neste ecrã e nada mais.

Apenas indicativo; não constitui uma oferta, um convite ao investimento nem aconselhamento de investimento. Os valores exatos, a identidade do promotor e os documentos do projeto são divulgados a investidores qualificados após a integração e o KYC da AfCEN, ao abrigo de NDA.