Heavy-haul rail corridor in GuineaIlustrativo
Minerais Estratégicos e Recursos NaturaisAFC-GIN-MIN-45603

Simandou Rail Corridor Commercial Development

Guinea · Multi-regionStrategic minerals / rail and port logistics infrastructure · Rail

An operating heavy-haul railway of about 650 km across Guinea, built for 120 Mt a year of iron ore exports, with a signed third-party access regime that opens the corridor to other freight and passengers.

Custo do projeto
c. USD 6,500m
Rail and port, co-developed, 2024¹
Capacidade
120 Mtpa
120 million tonnes/year/ano modelado
Calendário
Rail operating
Port targeted Q1 2027

Justificação

About 650 km of double-track railway, fully commissioned in Q1 2026, shipped 2.2 Mt of iron ore to China in the first half of 2026.¹ A third-party access regime signed in August 2023 opens it to farm produce, general freight and passengers;² what remains is putting that access into practice.

Rail
About 650 km of double track to a deep-water port
Capacity
120 Mtpa combined design capacity
Port
85% complete; commissioning targeted Q1 2027
Stage
Rail operating since Q1 2026

Oportunidade de investimento

Estrutura da transação

The core rail and port are privately financed; the opening is commercial use of the corridor by third parties.

Utilização dos fundos

Technical assistance to put third-party access, tariffs, and passenger and general-freight services into practice.

Base de receitas

Access tariffs for multi-user, multi-purpose traffic under the third-party access regime signed on 10 August 2023.²

O pedido

Technical assistance partners and prospective users, such as farm and general-freight shippers, to put the signed access regime into practice.

Porque é financiável

Built and operating.

Rail fully commissioned in Q1 2026; 2.2 Mt of iron ore shipped to China in the first half of 2026.¹

Fully financed core.

About USD 6.5bn of rail and port investment funded by the two mining joint ventures, with no open funding gap identified.¹

Signed access framework.

A third-party access regime, signed 10 August 2023, sets multi-user, multi-purpose and tariff arrangements.²

National ownership.

Guinea holds a 15% free-carried stake in the infrastructure company;² the assets transfer to the State after a 35-year operations period.¹

Dados e evidências · Corridor and operations

650 km
Double-track heavy-haul line
120 Mtpa
Combined design capacity
2.2 Mt
Iron ore shipped, H1 2026
85 %
Port complete, August 2026
15 %
State stake, free-carried

Maturidade e calendário do projeto

  1. OriginationOperating asset
  2. FeasibilityPre-feasibility analysis, 2026
  3. StructuringAccess regime signed 2023
  4. Financial closeCore fully financed
  5. Rail operationsCurrent stage

Principais riscos e medidas de mitigação

Third-party demand

Non-mining demand is not yet proven; tariff and spare capacity data are released under NDA.

Capacity priority

Iron ore is the anchor traffic; the signed regime sets multi-user and tariff arrangements for other users.

Port completion

Facilities 85% complete in August 2026; commissioning targeted for Q1 2027.

Condições da transação

Offtaker
Two anchor iron ore joint ventures; third-party users to follow
Contract status
Co-development and third-party access agreements signed, August 2023
Instrument sought
Technical assistance for third-party commercial access
Technology
Multi-use heavy-haul railway with deep-water port facilities
Capacity
120 million tonnes a year, combined
Development stage
Rail operating; port commissioning targeted for Q1 2027
WAIIS pillar
Strategic Minerals & Natural Resources

Impacto no desenvolvimento

Economic

Anchors Simandou 2040, Guinea's plan to use mineral development as a platform for wider industrialisation.¹

Integration

Designed to carry people, farm produce and general goods as well as iron ore.¹

Jobs

About 50,000 workers at the construction peak of the wider Simandou project, according to press reports.²

  1. Indicative, from co-developers' stock-exchange disclosures (21 June 2024) and the project's pre-feasibility analysis (2026); final figures released under NDA.
  2. Business Day, 29 November 2025 (length, state stake, workforce); Global Mining Review, August 2023 (third-party access regime).
  3. As imagens são ilustrativas.

O registo cria uma conta de investidor. A AfCEN conclui a integração e o KYC antes de divulgar qualquer coisa além desta página — o PDF do teaser contém exatamente o que está neste ecrã e nada mais.

Apenas indicativo; não constitui uma oferta, um convite ao investimento nem aconselhamento de investimento. Os valores exatos, a identidade do promotor e os documentos do projeto são divulgados a investidores qualificados após a integração e o KYC da AfCEN, ao abrigo de NDA.