Ewoyaa Lithium Project
Ghana · CentralStrategic minerals / lithium mining · Lithium
Set to be Ghana's first lithium mine, with a completed Definitive Feasibility Study for 3.6 Mt of spodumene concentrate over 12 years, a mining lease ratified by Parliament in March 2026 and a USD 217.5m construction requirement.¹ ²
Justificação
Ghana has no lithium production yet; this would be its first mine, exporting about 300,000 t a year of spodumene concentrate into battery-materials supply chains.¹ C1 cash costs of USD 377/t make it a low-cost producer, on a coastal site between the Takoradi and Tema ports.² ³
- Product
- Spodumene concentrate, c. 300 ktpa at steady state
- Resource
- 36.8 Mt at 1.24% Li2O; Reserve 25.6 Mt at 1.22%¹
- Stage
- DFS complete (2023); lease ratified March 2026
- Access
- N1 highway; 3 km grid link to Saltpond substation³
Oportunidade de investimento
Estrutura da transação
Construction financing for a DFS-stage open-pit mine; full construction financing and final investment decision are not yet closed.
Utilização dos fundos
Open-pit mine, dense media separation plant, site access road and a 3 km grid connection.³
Base de receitas
Export sales of spodumene concentrate, priced free-on-board at a Ghanaian port, into battery-materials supply chains.
O pedido
Construction finance and offtake partners for the USD 217.5m build, once ownership and financing structure are confirmed.
Porque é financiável
C1 cash costs of USD 377/t and all-in sustaining costs of USD 610/t of concentrate, free-on-board Ghana port.²
15-year mining lease ratified in March 2026, with royalty sliding from 5% below USD 1,500/t to 12% above USD 3,200/t.³
Mineral Resource of 36.8 Mt at 1.24% Li2O and Ore Reserve of 25.6 Mt at 1.22%, supporting 3.6 Mt of concentrate over 12 years.¹ ²
About 100 km south-west of Accra on the sealed N1 highway; Takoradi port 110 km west, Tema 140 km east.³
Dados e evidências · Resource, mine plan and costs
Maturidade e calendário do projeto
- OriginationLate-stage
- FeasibilityDFS 2023
- StructuringCurrent stage
- Financial closePost-diligence
- ConstructionTo follow
Principais riscos e medidas de mitigação
Full construction financing and FID are not yet closed; terms follow confirmation of the ownership and financing structure.
Offtake contracts are pending; offtake partners are sought alongside construction finance.
Concentrate prices are cyclical; low cash and sustaining costs and a price-linked royalty soften low-price periods.
Condições da transação
- Contract status
- Offtake and construction financing pending
- Instrument sought
- Construction finance: USD 217.5m
- Technology
- Open-pit mining with dense media separation to spodumene concentrate
- Capacity
- c. 300,000 t a year of spodumene concentrate at steady state
- Resource
- 36.8 Mt at 1.24% Li2O; Ore Reserve 25.6 Mt at 1.22% Li2O
- Development stage
- DFS complete (2023); mining lease ratified (March 2026)
- WAIIS pillar
- Strategic Minerals & Natural Resources
Impacto no desenvolvimento
Fiscal
Ghana's first lithium mining lease, with a price-linked royalty of 5–12% to the state.³
Jobs
Over 800 direct jobs expected, according to the 2023 DFS.²
Local capital
Ghanaian pension funds took part in pre-development funding of the project.¹