Diga-nos se algum texto desta página estiver incorreto ou pouco claro. A informação do projeto é apresentada em inglês, a versão oficial, até que a tradução para português esteja disponível.
Lithium mining and spodumene concentrate production asset in Ghana.Ilustrativo
Minerais Estratégicos e Recursos NaturaisAFC-GHA-MIN-70522

Ewoyaa Lithium Project

Ghana · CentralStrategic minerals / lithium mining · Lithium

Set to be Ghana's first lithium mine, with a completed Definitive Feasibility Study for 3.6 Mt of spodumene concentrate over 12 years, a mining lease ratified by Parliament in March 2026 and a USD 217.5m construction requirement.¹ ²

Custo do projeto
c. USD 217.5m
Construction requirement; 2023 DFS capex USD 185m¹
Capacidade
300,000 tonnes/year
300,000 tonnes/year/ano modelado
Capital pretendido
USD 217.5m
Capital sought
Calendário
To financial close
Then construction

Justificação

Ghana has no lithium production yet; this would be its first mine, exporting about 300,000 t a year of spodumene concentrate into battery-materials supply chains.¹ C1 cash costs of USD 377/t make it a low-cost producer, on a coastal site between the Takoradi and Tema ports.² ³

Product
Spodumene concentrate, c. 300 ktpa at steady state
Resource
36.8 Mt at 1.24% Li2O; Reserve 25.6 Mt at 1.22%¹
Stage
DFS complete (2023); lease ratified March 2026
Access
N1 highway; 3 km grid link to Saltpond substation³

Oportunidade de investimento

Estrutura da transação

Construction financing for a DFS-stage open-pit mine; full construction financing and final investment decision are not yet closed.

Utilização dos fundos

Open-pit mine, dense media separation plant, site access road and a 3 km grid connection.³

Base de receitas

Export sales of spodumene concentrate, priced free-on-board at a Ghanaian port, into battery-materials supply chains.

O pedido

Construction finance and offtake partners for the USD 217.5m build, once ownership and financing structure are confirmed.

Porque é financiável

Low-cost producer.

C1 cash costs of USD 377/t and all-in sustaining costs of USD 610/t of concentrate, free-on-board Ghana port.²

Lease ratified.

15-year mining lease ratified in March 2026, with royalty sliding from 5% below USD 1,500/t to 12% above USD 3,200/t.³

Defined resource.

Mineral Resource of 36.8 Mt at 1.24% Li2O and Ore Reserve of 25.6 Mt at 1.22%, supporting 3.6 Mt of concentrate over 12 years.¹ ²

Coastal, connected site.

About 100 km south-west of Accra on the sealed N1 highway; Takoradi port 110 km west, Tema 140 km east.³

Dados e evidências · Resource, mine plan and costs

36.8 Mt
Mineral Resource at 1.24% Li2O
25.6 Mt
Ore Reserve at 1.22% Li2O
3.6 Mt
Concentrate over 12-year life
377 USD/t
C1 cash cost, FOB port
610 USD/t
All-in sustaining cost

Maturidade e calendário do projeto

  1. OriginationLate-stage
  2. FeasibilityDFS 2023
  3. StructuringCurrent stage
  4. Financial closePost-diligence
  5. ConstructionTo follow

Principais riscos e medidas de mitigação

Financing and ownership

Full construction financing and FID are not yet closed; terms follow confirmation of the ownership and financing structure.

Offtake

Offtake contracts are pending; offtake partners are sought alongside construction finance.

Lithium price

Concentrate prices are cyclical; low cash and sustaining costs and a price-linked royalty soften low-price periods.

Condições da transação

Contract status
Offtake and construction financing pending
Instrument sought
Construction finance: USD 217.5m
Technology
Open-pit mining with dense media separation to spodumene concentrate
Capacity
c. 300,000 t a year of spodumene concentrate at steady state
Resource
36.8 Mt at 1.24% Li2O; Ore Reserve 25.6 Mt at 1.22% Li2O
Development stage
DFS complete (2023); mining lease ratified (March 2026)
WAIIS pillar
Strategic Minerals & Natural Resources

Impacto no desenvolvimento

Fiscal

Ghana's first lithium mining lease, with a price-linked royalty of 5–12% to the state.³

Jobs

Over 800 direct jobs expected, according to the 2023 DFS.²

Local capital

Ghanaian pension funds took part in pre-development funding of the project.¹

  1. Indicative, from the project's pre-feasibility analysis; the 2023 DFS itself published capex of USD 185m. Final figures released under NDA.
  2. Definitive Feasibility Study, June 2023, as reported by Kitco (29 June 2023) and Global Mining Review (6 July 2023).
  3. MINING.COM, 20 March 2026 (lease and royalty); NS Energy, December 2024 (location, grid and ports).
  4. As imagens são ilustrativas.

O registo cria uma conta de investidor. A AfCEN conclui a integração e o KYC antes de divulgar qualquer coisa além desta página — o PDF do teaser contém exatamente o que está neste ecrã e nada mais.

Apenas indicativo; não constitui uma oferta, um convite ao investimento nem aconselhamento de investimento. Os valores exatos, a identidade do promotor e os documentos do projeto são divulgados a investidores qualificados após a integração e o KYC da AfCEN, ao abrigo de NDA.