Regional high-voltage transmission infrastructure in West Africa.Illustratif
Commerce de l'énergie et croissance industrielleAFC-REG-ENER-49511

OMVG Energy Interconnection

Gambia / Guinea / Guinea-Bissau / Senegal (four-country regional project) · RegionalEnergy — power transmission · Regional electricity transmission interconnection

The 1,677 km, 225 kV OMVG ring links the grids of The Gambia, Guinea, Guinea-Bissau and Senegal with 800 MW of trade capacity, benefiting 15 million people; USD 311m is sought toward the c. USD 711m programme.

Coût du projet
c. USD 711m
Multi-donor financing package¹
Capacité
800 MW
c. 2,102.4 GWh/year/an (estimation)
Capital recherché
USD 311m
Capital sought
Calendrier
Largely energised
Last major substation 2025

Justification

The 1,677 km ring carries Guinea's Kaleta and Souapiti hydropower to four member states, with 800 MW of trade capacity, eight times The Gambia's peak load.¹ ² It is largely energised and brings cleaner, lower-cost power to more than 2.5 million households and businesses.²

Line
1,677 km, 225 kV AC overhead ring
Substations
15, plus two dispatch centres
Capacity
800 MW of trade capacity
Stage
Largely energised; Antula inaugurated 2025

Opportunité d'investissement

Structure de l'opération

USD 311m sought toward the c. USD 711m interconnection programme of four member states.

Utilisation des fonds

Being confirmed with OMVG; the programme covers 1,677 km of 225 kV line, 15 substations, two dispatch centres and fibre.

Source des revenus

Bilateral electricity trading contracts between the four national utilities, negotiated in 2019, with a 35-year tenor.

Ce qui est recherché

USD 311m from investors and lenders; scope, use of funds and structure are released to qualified investors under NDA.

Pourquoi le projet est bancable

Built and energised.

The ring is largely energised; the last major substation, Antula in Guinea-Bissau, was inaugurated on 25 April 2025.³

Contracted trade.

Bilateral trading contracts between the four state-owned utilities underpin use of the line, on a 35-year tenor.¹

Low-cost hydro supply.

Built to carry power from Guinea's Kaleta (240 MW) and Souapiti (450 MW) hydropower plants to all four member states.¹

Multilateral backing.

USD 200m from the World Bank and over USD 500m from co-financiers: five multilateral banks and three bilateral agencies.²

Données et éléments probants · Network and reach

1,677 km
225 kV ring across four countries
800 MW
Trade capacity, 8x The Gambia's peak load
15 substations
Plus two dispatch centres
15m people
Beneficiaries
2.5m connections
Households and businesses served

Degré de maturité et calendrier du projet

  1. OriginationLate-stage development
  2. FeasibilityCompleted
  3. StructuringTrading contracts signed
  4. Financial closePost-diligence
  5. ConstructionCurrent stage, largely energised

Principaux risques et mesures d'atténuation

Cross-border coordination

Four utilities share the asset; trading contracts are signed and OMVG, the four-government basin body, owns it.

Utility credit

Revenue rests on four state-owned utilities rather than one buyer, under 35-year trading contracts.

Completion

The ring is largely energised; the last major substation was inaugurated in April 2025.³

Conditions de l'opération

Offtaker
State-owned utilities: NAWEC, EDG, EAGB and Senelec
Contract status
Bilateral trading contracts signed (negotiated 2019); 35-year tenor
Structure
Regional asset of OMVG, the four-government Gambia River Basin Development Organisation
Technology
225 kV AC overhead line, 15 substations, 2 dispatch centres
Financing to date
USD 200m World Bank; over USD 500m from co-financiers²
E&S category
Category B (AfCEN screening); resettlement plans published 2019–2020
WAIIS pillar
Energy Trade & Industrial Growth

Impact sur le développement

Access

Cleaner, lower-cost and more reliable power for more than 2.5 million households and businesses.²

Climate

Guinea-Bissau moved from rented heavy fuel oil power to 100% hydroelectricity imported from Guinea.²

Scale

800 MW of trade capacity, eight times the current peak load of The Gambia.²

Integration

A core link of the West African Power Pool and PIDA, alongside the CLSG and OMVS interconnectors.¹

  1. Indicative, from the project's pre-feasibility analysis; final figures released under NDA.
  2. World Bank, Powering Africa: regional energy projects in West Africa, results brief, February 2025.
  3. APA News, Antula substation inauguration, Bissau, April 2025.
  4. Images à titre d'illustration.

L'inscription crée un compte investisseur. AfCEN finalise le parcours d'intégration et le KYC avant de communiquer toute information au-delà de cette page. Le teaser PDF reprend exactement le contenu de cet écran, et rien de plus.

À titre indicatif uniquement ; ne constitue ni une offre, ni une invitation à investir, ni un conseil en investissement. Les chiffres exacts, l'identité du promoteur et les documents du projet sont communiqués aux investisseurs qualifiés après le parcours d'intégration et le KYC d'AfCEN, sous accord de confidentialité.