Bombore Gold Project — Stage 2 Hard Rock Expansion
Burkina Faso · CentreStrategic minerals / gold mining and processing · Hard-rock sulphide gold processing (expansion of an existing oxide operation)
Expansion of an operating gold mine in central Burkina Faso: Stage 2 lifts hard-rock throughput to 5–5.5 Mtpa inside the existing footprint, taking output towards 220,000–250,000 oz of gold a year for a preliminary USD 90–95m.¹
Justification
The mine has poured gold from its oxide plant since December 2022, and a fully funded Stage 1 hard-rock plant is forecast to lift 2026 output to 170,000–185,000 oz.¹ Stage 2 adds processing units within the same footprint to reach 220,000–250,000 oz a year.
- Stage
- Operating mine; Stage 1 fully funded July 2024
- Scheme
- Hard-rock CIL plant beside the oxide plant
- Capacity
- 5–5.5 Mtpa hard-rock throughput after Stage 2
- Reserves
- c. 2.4 Moz Proven and Probable at 0.72 g/t²
Opportunité d'investissement
Structure de l'opération
Debt or strategic equity in Stage 2 of a producing gold mine; Stage 1 was fully funded in July 2024 with USD 105m of debt and equity.
Utilisation des fonds
Four CIL tanks, an oxygen plant, a ball mill, a thickener and a pebble crusher, added within the Stage 1 footprint.
Source des revenus
Gold sales into a deep, liquid global market.
Ce qui est recherché
Regional debt or strategic equity partners for Stage 2, once the residual funding need is confirmed under NDA.
Pourquoi le projet est bancable
Oxide plant in commercial production since December 2022, delivered on schedule and under budget; 110,014 oz produced in FY2025.³
Stage 1 was financed with a USD 58m senior loan from a regional bank and USD 47m of strategic equity from a West African investor.
Stage 2 adds processing units inside the Stage 1 footprint, with a 14-month construction period.¹
An NI 43-101 expansion study (October 2023) defines 103.5 Mt of Proven and Probable Reserves at 0.72 g/t.²
Données et éléments probants · Stage 1 today vs with Stage 2
| Stage 1 (2026) | With Stage 2 | |
|---|---|---|
| Gold output | 170,000–185,000 oz forecast for 2026 | 220,000–250,000 oz a year target |
| Hard-rock plant | 2.5 Mtpa | 5–5.5 Mtpa, same footprint |
| Funding | Fully funded, July 2024 | Preliminary USD 90–95m; need under review |
Degré de maturité et calendrier du projet
- OriginationOperating mine
- FeasibilityStudy Oct 2023
- StructuringCurrent stage
- Financial closePost-diligence
- ConstructionTo follow
Principaux risques et mesures d'atténuation
Stage 2 awaits final board approval; the residual funding need is confirmed with the sponsor under NDA before any terms.
Units are added inside the Stage 1 footprint over a 14-month build, by a team that delivered the oxide plant on schedule and under budget.
Revenue follows the gold price; output sells into a deep, liquid global market.
Conditions de l'opération
- Instrument sought
- Debt or strategic equity, subject to a confirmed Stage 2 funding need
- Contract status
- Stage 2 subject to final board approval (latest status, February 2026)
- Technology
- Hard-rock carbon-in-leach (CIL) plant alongside the existing oxide plant
- Annual output
- Up to 250,000 oz of gold a year after Stage 2
- Development stage
- Operating mine; Stage 1 fully funded; Stage 2 study complete
- WAIIS pillar
- Strategic Minerals & Natural Resources
Impact sur le développement
Economic
Gold export earnings and fiscal revenue for Burkina Faso, which holds a free-carried equity interest in the mine.
Regional capital
Stage 1 drew on a regional bank and a West African investor, deepening regional capital-market participation.