Heavy-haul rail corridor in GuineaIllustratif
Minéraux stratégiques et ressources naturellesAFC-GIN-MIN-45603

Simandou Rail Corridor Commercial Development

Guinea · Multi-regionStrategic minerals / rail and port logistics infrastructure · Rail

An operating heavy-haul railway of about 650 km across Guinea, built for 120 Mt a year of iron ore exports, with a signed third-party access regime that opens the corridor to other freight and passengers.

Coût du projet
c. USD 6,500m
Rail and port, co-developed, 2024¹
Capacité
120 Mtpa
120 million tonnes/year/an (modélisation)
Calendrier
Rail operating
Port targeted Q1 2027

Justification

About 650 km of double-track railway, fully commissioned in Q1 2026, shipped 2.2 Mt of iron ore to China in the first half of 2026.¹ A third-party access regime signed in August 2023 opens it to farm produce, general freight and passengers;² what remains is putting that access into practice.

Rail
About 650 km of double track to a deep-water port
Capacity
120 Mtpa combined design capacity
Port
85% complete; commissioning targeted Q1 2027
Stage
Rail operating since Q1 2026

Opportunité d'investissement

Structure de l'opération

The core rail and port are privately financed; the opening is commercial use of the corridor by third parties.

Utilisation des fonds

Technical assistance to put third-party access, tariffs, and passenger and general-freight services into practice.

Source des revenus

Access tariffs for multi-user, multi-purpose traffic under the third-party access regime signed on 10 August 2023.²

Ce qui est recherché

Technical assistance partners and prospective users, such as farm and general-freight shippers, to put the signed access regime into practice.

Pourquoi le projet est bancable

Built and operating.

Rail fully commissioned in Q1 2026; 2.2 Mt of iron ore shipped to China in the first half of 2026.¹

Fully financed core.

About USD 6.5bn of rail and port investment funded by the two mining joint ventures, with no open funding gap identified.¹

Signed access framework.

A third-party access regime, signed 10 August 2023, sets multi-user, multi-purpose and tariff arrangements.²

National ownership.

Guinea holds a 15% free-carried stake in the infrastructure company;² the assets transfer to the State after a 35-year operations period.¹

Données et éléments probants · Corridor and operations

650 km
Double-track heavy-haul line
120 Mtpa
Combined design capacity
2.2 Mt
Iron ore shipped, H1 2026
85 %
Port complete, August 2026
15 %
State stake, free-carried

Degré de maturité et calendrier du projet

  1. OriginationOperating asset
  2. FeasibilityPre-feasibility analysis, 2026
  3. StructuringAccess regime signed 2023
  4. Financial closeCore fully financed
  5. Rail operationsCurrent stage

Principaux risques et mesures d'atténuation

Third-party demand

Non-mining demand is not yet proven; tariff and spare capacity data are released under NDA.

Capacity priority

Iron ore is the anchor traffic; the signed regime sets multi-user and tariff arrangements for other users.

Port completion

Facilities 85% complete in August 2026; commissioning targeted for Q1 2027.

Conditions de l'opération

Offtaker
Two anchor iron ore joint ventures; third-party users to follow
Contract status
Co-development and third-party access agreements signed, August 2023
Instrument sought
Technical assistance for third-party commercial access
Technology
Multi-use heavy-haul railway with deep-water port facilities
Capacity
120 million tonnes a year, combined
Development stage
Rail operating; port commissioning targeted for Q1 2027
WAIIS pillar
Strategic Minerals & Natural Resources

Impact sur le développement

Economic

Anchors Simandou 2040, Guinea's plan to use mineral development as a platform for wider industrialisation.¹

Integration

Designed to carry people, farm produce and general goods as well as iron ore.¹

Jobs

About 50,000 workers at the construction peak of the wider Simandou project, according to press reports.²

  1. Indicative, from co-developers' stock-exchange disclosures (21 June 2024) and the project's pre-feasibility analysis (2026); final figures released under NDA.
  2. Business Day, 29 November 2025 (length, state stake, workforce); Global Mining Review, August 2023 (third-party access regime).
  3. Images à titre d'illustration.

L'inscription crée un compte investisseur. AfCEN finalise le parcours d'intégration et le KYC avant de communiquer toute information au-delà de cette page. Le teaser PDF reprend exactement le contenu de cet écran, et rien de plus.

À titre indicatif uniquement ; ne constitue ni une offre, ni une invitation à investir, ni un conseil en investissement. Les chiffres exacts, l'identité du promoteur et les documents du projet sont communiqués aux investisseurs qualifiés après le parcours d'intégration et le KYC d'AfCEN, sous accord de confidentialité.