Ewoyaa Lithium Project
Ghana · CentralStrategic minerals / lithium mining · Lithium
Set to be Ghana's first lithium mine, with a completed Definitive Feasibility Study for 3.6 Mt of spodumene concentrate over 12 years, a mining lease ratified by Parliament in March 2026 and a USD 217.5m construction requirement.¹ ²
Justification
Ghana has no lithium production yet; this would be its first mine, exporting about 300,000 t a year of spodumene concentrate into battery-materials supply chains.¹ C1 cash costs of USD 377/t make it a low-cost producer, on a coastal site between the Takoradi and Tema ports.² ³
- Product
- Spodumene concentrate, c. 300 ktpa at steady state
- Resource
- 36.8 Mt at 1.24% Li2O; Reserve 25.6 Mt at 1.22%¹
- Stage
- DFS complete (2023); lease ratified March 2026
- Access
- N1 highway; 3 km grid link to Saltpond substation³
Opportunité d'investissement
Structure de l'opération
Construction financing for a DFS-stage open-pit mine; full construction financing and final investment decision are not yet closed.
Utilisation des fonds
Open-pit mine, dense media separation plant, site access road and a 3 km grid connection.³
Source des revenus
Export sales of spodumene concentrate, priced free-on-board at a Ghanaian port, into battery-materials supply chains.
Ce qui est recherché
Construction finance and offtake partners for the USD 217.5m build, once ownership and financing structure are confirmed.
Pourquoi le projet est bancable
C1 cash costs of USD 377/t and all-in sustaining costs of USD 610/t of concentrate, free-on-board Ghana port.²
15-year mining lease ratified in March 2026, with royalty sliding from 5% below USD 1,500/t to 12% above USD 3,200/t.³
Mineral Resource of 36.8 Mt at 1.24% Li2O and Ore Reserve of 25.6 Mt at 1.22%, supporting 3.6 Mt of concentrate over 12 years.¹ ²
About 100 km south-west of Accra on the sealed N1 highway; Takoradi port 110 km west, Tema 140 km east.³
Données et éléments probants · Resource, mine plan and costs
Degré de maturité et calendrier du projet
- OriginationLate-stage
- FeasibilityDFS 2023
- StructuringCurrent stage
- Financial closePost-diligence
- ConstructionTo follow
Principaux risques et mesures d'atténuation
Full construction financing and FID are not yet closed; terms follow confirmation of the ownership and financing structure.
Offtake contracts are pending; offtake partners are sought alongside construction finance.
Concentrate prices are cyclical; low cash and sustaining costs and a price-linked royalty soften low-price periods.
Conditions de l'opération
- Contract status
- Offtake and construction financing pending
- Instrument sought
- Construction finance: USD 217.5m
- Technology
- Open-pit mining with dense media separation to spodumene concentrate
- Capacity
- c. 300,000 t a year of spodumene concentrate at steady state
- Resource
- 36.8 Mt at 1.24% Li2O; Ore Reserve 25.6 Mt at 1.22% Li2O
- Development stage
- DFS complete (2023); mining lease ratified (March 2026)
- WAIIS pillar
- Strategic Minerals & Natural Resources
Impact sur le développement
Fiscal
Ghana's first lithium mining lease, with a price-linked royalty of 5–12% to the state.³
Jobs
Over 800 direct jobs expected, according to the 2023 DFS.²
Local capital
Ghanaian pension funds took part in pre-development funding of the project.¹