Lithium mining and spodumene concentrate production asset in Ghana.Illustratif
Minéraux stratégiques et ressources naturellesAFC-GHA-MIN-70522

Ewoyaa Lithium Project

Ghana · CentralStrategic minerals / lithium mining · Lithium

Set to be Ghana's first lithium mine, with a completed Definitive Feasibility Study for 3.6 Mt of spodumene concentrate over 12 years, a mining lease ratified by Parliament in March 2026 and a USD 217.5m construction requirement.¹ ²

Coût du projet
c. USD 217.5m
Construction requirement; 2023 DFS capex USD 185m¹
Capacité
300,000 tonnes/year
300,000 tonnes/year/an (modélisation)
Capital recherché
USD 217.5m
Capital sought
Calendrier
To financial close
Then construction

Justification

Ghana has no lithium production yet; this would be its first mine, exporting about 300,000 t a year of spodumene concentrate into battery-materials supply chains.¹ C1 cash costs of USD 377/t make it a low-cost producer, on a coastal site between the Takoradi and Tema ports.² ³

Product
Spodumene concentrate, c. 300 ktpa at steady state
Resource
36.8 Mt at 1.24% Li2O; Reserve 25.6 Mt at 1.22%¹
Stage
DFS complete (2023); lease ratified March 2026
Access
N1 highway; 3 km grid link to Saltpond substation³

Opportunité d'investissement

Structure de l'opération

Construction financing for a DFS-stage open-pit mine; full construction financing and final investment decision are not yet closed.

Utilisation des fonds

Open-pit mine, dense media separation plant, site access road and a 3 km grid connection.³

Source des revenus

Export sales of spodumene concentrate, priced free-on-board at a Ghanaian port, into battery-materials supply chains.

Ce qui est recherché

Construction finance and offtake partners for the USD 217.5m build, once ownership and financing structure are confirmed.

Pourquoi le projet est bancable

Low-cost producer.

C1 cash costs of USD 377/t and all-in sustaining costs of USD 610/t of concentrate, free-on-board Ghana port.²

Lease ratified.

15-year mining lease ratified in March 2026, with royalty sliding from 5% below USD 1,500/t to 12% above USD 3,200/t.³

Defined resource.

Mineral Resource of 36.8 Mt at 1.24% Li2O and Ore Reserve of 25.6 Mt at 1.22%, supporting 3.6 Mt of concentrate over 12 years.¹ ²

Coastal, connected site.

About 100 km south-west of Accra on the sealed N1 highway; Takoradi port 110 km west, Tema 140 km east.³

Données et éléments probants · Resource, mine plan and costs

36.8 Mt
Mineral Resource at 1.24% Li2O
25.6 Mt
Ore Reserve at 1.22% Li2O
3.6 Mt
Concentrate over 12-year life
377 USD/t
C1 cash cost, FOB port
610 USD/t
All-in sustaining cost

Degré de maturité et calendrier du projet

  1. OriginationLate-stage
  2. FeasibilityDFS 2023
  3. StructuringCurrent stage
  4. Financial closePost-diligence
  5. ConstructionTo follow

Principaux risques et mesures d'atténuation

Financing and ownership

Full construction financing and FID are not yet closed; terms follow confirmation of the ownership and financing structure.

Offtake

Offtake contracts are pending; offtake partners are sought alongside construction finance.

Lithium price

Concentrate prices are cyclical; low cash and sustaining costs and a price-linked royalty soften low-price periods.

Conditions de l'opération

Contract status
Offtake and construction financing pending
Instrument sought
Construction finance: USD 217.5m
Technology
Open-pit mining with dense media separation to spodumene concentrate
Capacity
c. 300,000 t a year of spodumene concentrate at steady state
Resource
36.8 Mt at 1.24% Li2O; Ore Reserve 25.6 Mt at 1.22% Li2O
Development stage
DFS complete (2023); mining lease ratified (March 2026)
WAIIS pillar
Strategic Minerals & Natural Resources

Impact sur le développement

Fiscal

Ghana's first lithium mining lease, with a price-linked royalty of 5–12% to the state.³

Jobs

Over 800 direct jobs expected, according to the 2023 DFS.²

Local capital

Ghanaian pension funds took part in pre-development funding of the project.¹

  1. Indicative, from the project's pre-feasibility analysis; the 2023 DFS itself published capex of USD 185m. Final figures released under NDA.
  2. Definitive Feasibility Study, June 2023, as reported by Kitco (29 June 2023) and Global Mining Review (6 July 2023).
  3. MINING.COM, 20 March 2026 (lease and royalty); NS Energy, December 2024 (location, grid and ports).
  4. Images à titre d'illustration.

L'inscription crée un compte investisseur. AfCEN finalise le parcours d'intégration et le KYC avant de communiquer toute information au-delà de cette page. Le teaser PDF reprend exactement le contenu de cet écran, et rien de plus.

À titre indicatif uniquement ; ne constitue ni une offre, ni une invitation à investir, ni un conseil en investissement. Les chiffres exacts, l'identité du promoteur et les documents du projet sont communiqués aux investisseurs qualifiés après le parcours d'intégration et le KYC d'AfCEN, sous accord de confidentialité.