225 kV transmission infrastructure in Sierra LeoneIllustratif
Commerce de l'énergie et croissance industrielleAFCEN-WAIIS-ENERGY-SL-006

Northern Corridor Transmission Line (225 kV)

Sierra Leone · Multi-regionEnergy · High-voltage transmission (225 kV)

A 225 kV northern transmission corridor, a national priority project with feasibility completed, that links to the CLSG regional line and ends at a new Newton substation, relieving the single 161 kV feed to Freetown. USD 100m sought as blended equity and debt.

Coût du projet
c. USD 400m
Estimé, indicatif
Capacité
225 kV
Capital recherché
USD 100m
Blended capital sought
Instrument
Financement mixte
Blended equity and debt, alongside initial funds already secured.¹
Calendrier
To financial close
Then construction

Justification

About 140 MW of grid supply meets unconstrained demand of about 320 MW, projected at 485 MW by 2030, and a single 161 kV line carries Bumbuna hydro and imports to Freetown.² The corridor relieves that bottleneck and closes a 225 kV ring joined to the CLSG regional line.

Line
225 kV overhead, with optical ground wire
Route
Northern region to a new Newton substation
Link
Joins the 1,303 km CLSG 225 kV line³
Stage
Feasibility completed; in structuring

Opportunité d'investissement

Structure de l'opération

Blended equity and debt for a 225 kV line under a 25-year utility contract, now in negotiation.

Utilisation des fonds

A 225 kV line across the Northern region to a new substation at Newton, with optical ground wire.

Source des revenus

Transmission contract with EDSA, the national distribution utility, as offtaker; 25-year tenor in negotiation.

Ce qui est recherché

USD 100m in blended equity and debt, alongside the initial funds already secured, to build the corridor.

Pourquoi le projet est bancable

National priority.

Among the priority projects of Sierra Leone's Mission 300 Energy Compact, with feasibility completed and initial funds secured.²

Closes the grid ring.

With the MCC-funded southern corridor, it joins the CLSG 225 kV line and ends at Newton, forming a national ring.²

Removes a bottleneck.

One single-circuit 161 kV line carries Bumbuna hydro and imports to Freetown and limits use of the CLSG interconnector.²

Demand outruns supply.

About 140 MW of grid supply meets demand of about 320 MW, projected at 485 MW by 2030; mining is the largest growth load.²

Données et éléments probants · Sierra Leone grid: today and the 2030 plan

Today (2025)With the northern and southern corridors
Main feed to FreetownOne single-circuit 161 kV line225 kV ring joined to the CLSG line
Transmission network802 km1,235 km by 2030
Electricity access36% of the population78% target by 2030

Degré de maturité et calendrier du projet

  1. OriginationGreenfield
  2. FeasibilityCompleted
  3. StructuringCurrent stage
  4. Financial closePost-diligence
  5. ConstructionTo follow

Principaux risques et mesures d'atténuation

Offtake

The 25-year utility contract is still in negotiation; the offtake term sheet is released under NDA.

Utility credit

Revenue depends on the national distribution utility; mining load and lower-cost supply strengthen its revenue base.²

Environmental and social

Category A on AfCEN screening; E&S impact documentation is released in the Tier 2 data room.

Conditions de l'opération

Offtaker
Utility: EDSA, the national distribution utility
Contract status
In negotiation; 25-year tenor
Instrument sought
Blended: equity and debt
Technology
225 kV overhead transmission line with optical ground wire
Location
Northern Sierra Leone to Newton, Western Area; route under NDA
Development stage
Feasibility completed; in structuring
E&S category
Category A (AfCEN screening)
WAIIS pillar
Energy Trade & Industrial Growth

Impact sur le développement

Access

Supports the national goal of raising electricity access from 36% to 78% of the population by 2030.²

Lower cost

Evacuates lower-cost hydro and imports; the Compact expects supply costs to fall to USD 14–16 cents/kWh.²

Mining and industry

Reliable, low-emission grid power for mining, the largest growth load.²

Integration

CLSG imports are estimated to replace about 80% of the thermal generation Sierra Leone would otherwise need.⁴

  1. Indicative; capital structure under review, final figures released under NDA.
  2. Government of Sierra Leone, National Energy Compact (Mission 300), 2025.
  3. World Bank, Powering Africa results brief, February 2025.
  4. World Bank, CLSG (WAPP APL4) Implementation Completion and Results Report, June 2024.
  5. Images à titre d'illustration.

L'inscription crée un compte investisseur. AfCEN finalise le parcours d'intégration et le KYC avant de communiquer toute information au-delà de cette page. Le teaser PDF reprend exactement le contenu de cet écran, et rien de plus.

À titre indicatif uniquement ; ne constitue ni une offre, ni une invitation à investir, ni un conseil en investissement. Les chiffres exacts, l'identité du promoteur et les documents du projet sont communiqués aux investisseurs qualifiés après le parcours d'intégration et le KYC d'AfCEN, sous accord de confidentialité.