Electronics assembly and device provisioning facility typeIllustrative
Digital TransformationSL-ELE-ASM-01

Sierra Leone Electronics Assembly Plant, Technical Training Centre & Smart Schools Programme

Sierra LeoneInformation and Communications Technology (ICT) / Electronics Manufacturing · Electronics Assembly, Device Provisioning & Smart Schools Educational Infrastructure

A greenfield electronics assembly, device provisioning and smart schools infrastructure project in Sierra Leone, combining local assembly, repair and classroom power systems for public education demand. It targets government-backed deployment with a 10-year contract tenor under consideration.

Project cost
c. USD 21.9m
Total project investment envelope
Capacity
24 assembly & repair workstations (Phase 1 deployment)
21,942,000 USD (Initial full project funding envelope)/yr modelled
Capital sought
USD 21.9m
Blended capital sought
Instrument
Blended finance
Blended financing is being sought for the full funding requirement.
Timeline
10-year plan
Government review underway

Rationale

Public schools and educational institutions in Sierra Leone require local device configuration, technical training, classroom solarization and after-sales repair infrastructure. This project proposes 24 Phase 1 assembly and repair workstations under a 10-year government-facing contract structure under consideration.

Sector
ICT / electronics manufacturing
Scheme
Assembly, repair and smart schools
Units
24 Phase 1 workstations
Stage
Greenfield

Investment opportunity

Transaction structure

Blended financing for a greenfield electronics assembly and smart schools platform serving government demand in Sierra Leone.

Use of funds

Facility and equipment, contingency, working capital, utility connection, solar PV, battery backup, generator resilience and deployment systems.

Revenue basis

Revenue is expected from government-backed demand for device provisioning, technical training, classroom solarization and after-sales repair. The investment proposal is under consideration.

The ask

Blended capital for the full USD 21.94 million funding requirement, alongside government engagement on site and contract structure.

Why it is bankable

Defined public demand.

Public schools and educational institutions require device configuration, training, classroom solarization and repair support.

Integrated offer.

The project combines assembly, testing, repair, classroom systems, solar PV and storage in one platform.

Government route to market.

The offtaker type is government, and the proposal is under consideration by MoCTI and the Government of Sierra Leone.

Resilience built in.

The power plan includes grid supply with solar PV, battery backup and generator resilience for factory operations.

Data and evidence · Project evidence

24 workstations
Phase 1 assembly and repair
10 yr
Contract tenor in view
1.25 USDm/yr
Annual opex estimate
2026
Plan and capex vintage

Project readiness and timeline

  1. OriginationCurrent stage
  2. FeasibilityProposal and plan prepared
  3. StructuringUnder government consideration
  4. Financial closeCapital to be raised
  5. Phase 1 operationsTo follow

Key risks and mitigants

Contracting

government contract remains under consideration

Site

site identification and title review are under engagement with government

Financing

full capital requirement is still to be raised

Transaction terms

Instrument
Blended financing
Capital sought
USD 21.94 million
Contract tenor
10 years
ES category
Category B

Development impact

Education access

supports public schools with device provisioning, technical training and classroom solarization.

Local capability

establishes local electronics assembly and after-sales repair capacity.

Energy resilience

includes solar PV and lithium storage for classroom and factory continuity.

Jobs

local assembly, repair and technical support functions are expected, but numbers are not disclosed.

  1. Images are illustrative.

Registering creates an investor account. AfCEN completes onboarding and KYC before anything beyond this page is released — the teaser PDF carries exactly what is on this screen and nothing more.

Indicative only; not an offer, an invitation to invest, or investment advice. Exact figures, sponsor identity and project documents are released to qualified investors after AfCEN onboarding and KYC, under NDA.